
We – EPG Group the biggest gearbox & motors , couplings and gears manufacturing facility in China with 5 different branches. For much more particulars: Cell/whatsapp/telegram/Kakao us at: 0086~13083988828 13858117778083988828
product name:
IEC Normal AC 3 phase 10hp Electric Motor
Item Description:
YE2 Sequence Forged of Iron Three Stage Induction Motor is specially designed for European market place, whose terminal box is positioned on
the prime of motor.They are entirely enclosed and admirer-cooling made. They are newly developed in conformity with the appropriate
requirements / rules of IEC&DIN42673 expectations.
| Sort |
YE2 |
| Electricity |
.seventy five~315kw |
| Insulation |
F / B, H/B |
| Voltage and frequency |
380/four hundred/415/660/690V 50/60hz |
| Velocity |
3000/1500/one thousand/750/600 rpm |
| Mounitng |
IMB3/IMV1 |
| Cooling and ventilation |
TEFC in accordance with IC411 of IEC60034-6. |
| Winding |
one hundred% Cooper Wire |
| Protection class |
IP54/IP55 |
| Vibration |
vibration class A, vibration class B is available on request. |
| Quality assurance |
ISO9001 |
| Site conditions |
from -15°C t0 +40°C and altitude below 1000 meters |
packaging:
Business Demonstrate :
certification
Worldwide Marketing and advertising & Support Network
Worldwide Ideal Advertising provider network is one of jinlite motor’s advantage. we have 40 branches in china primary city,8 branches in
the Overseas ,Our enterprise penetrates a lot more than sixty nations and locations such as South The united states, North The united states,Europe, Asia
Center East and Africa, Supplying us speedy achieve potential from product sales, support, procurement and Transportation since inception, Pinxing
constantly uphold the advancement approach of market place globalization. we section and place customers demands and ept industry. our
items and support are widely employed in international business, and performance secure and safety.we custom made various motors for different
industries
FAQ
Q: Do you supply OEM provider?
A: Sure
Q: What is your payment phrase?
A: 30% T/T in progress, 70% balance when getting B/L duplicate. Or irrevocable L/C.
Q: What is your guide time?
A: About 30 days soon after acquiring deposit or original L/C.
Q: What certifiicates do you have?
A: We have CE, ISO. And we can implement.
The use of first products manufacturer’s (OEM) portion quantities or emblems , e.g. CASE® and John Deere® are for reference reasons only and for indicating product use and compatibility. Our organization and the shown alternative components contained herein are not sponsored, approved, or manufactured by the OEM.

